Report on the Impact of the solar flare on the LWS instrument
The result of the quality check performed by the LIDT on the 4 LWS observations
of revolution 722 is to recommend their re-scheduling.
The reasons are :
- For TDTs 72200510 & 72200615 (executed during the first half of the
rev) no AAL product can be generated because of no illuminator data
available (all ramps discarded by the de-glitching algorithm !)
- For TDTs 72200934 & 72201802 (performed during the second half) the
pipeline completed successfuly but the glith rate is too high : only
about 30 % of the data remained after the deglitching.
Damien Texier